Second Stage Xstream 9/16 Duration

Second Stage Xstream 9/16 Duration

0120-001
Xstream Duration second stage9/16" connection
SEK3,200
The Xstream second stage is an upstream regulator. The safety valve (OPV) ensures pressure inside the regulator will stay at a point in which for normal breathing in the event of a failure. In the unlikely event that the regulator fails, it will not free flow; it will continue to breathe normally without suffering massive gas loss.